国产免费嫩草影院,大伊香蕉精品视频在线,国产精品美女久久久M,日韩欧美一本二本三本在线播放

冷再生施工和機(jī)械租賃業(yè)務(wù)
筑路架橋,奉獻(xiàn)社會(huì);以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁(yè)>>新聞中心路面銑刨拉毛的現(xiàn)象出現(xiàn)怎么解決?

路面銑刨拉毛的現(xiàn)象出現(xiàn)怎么解決?

來源:http://m.jsscr.com/ 日期:2023-12-25 發(fā)布人:

在路面坑槽、車轍、龜網(wǎng)裂銑刨時(shí),不需要設(shè)置銑刨過渡段,依據(jù)設(shè)計(jì)的銑刨深度,結(jié)合路面確定的病害面積,確定銑刨機(jī)基準(zhǔn)面和橫坡,靠近病害一側(cè)部位進(jìn)行銑刨,要求銑刨機(jī)調(diào)整找平儀始終保持正常的工作狀態(tài)進(jìn)行銑刨作業(yè),直該病害區(qū)域銑刨完畢。

When milling grooves, ruts, and turtle net cracks on the road surface, there is no need to set up a milling transition section. Based on the designed milling depth and the determined area of the road surface, the benchmark surface and cross slope of the milling machine are determined, and milling is carried out near the diseased side. The milling machine is required to adjust the leveling device to maintain normal working status throughout the milling operation until the diseased area is fully milled.

在病害路面修補(bǔ)大于二個(gè)結(jié)構(gòu)層時(shí),應(yīng)把路面的不同結(jié)構(gòu)層分層錯(cuò)臺(tái)銑刨,且每層小錯(cuò)臺(tái)不小于50cm,以利于面層修補(bǔ)時(shí)不同結(jié)構(gòu)層接縫錯(cuò)開。

When repairing a damaged road surface with more than two structural layers, the different structural layers of the road surface should be milled and planed in layers, and the small misalignment of each layer should not be less than 50cm, in order to facilitate the staggered joints of different structural layers during surface layer repair.

在油包擁包銑刨拉毛過程中一定要控制好三個(gè)關(guān)鍵環(huán)節(jié)以確保銑刨拉毛效果,開始銑刨過渡段,銑刨機(jī)銑刨深度要從零緩慢調(diào)整到計(jì)算的銑刨深度;第二,銑刨過程中銑刨深度調(diào)整段,無論是增大還是減小銑刨深度,都要從原銑刨深度逐漸調(diào)整到新的銑刨深度,嚴(yán)禁突變,這就要求在劃定銑刨區(qū)間時(shí)標(biāo)定好調(diào)整過渡段的位置;第三,結(jié)束銑刨過渡段,銑刨機(jī)也要將原銑刨深度緩慢降低到零。

In the process of milling and roughening the oil package, it is necessary to control three key links to ensure the milling and roughening effect. Start milling the transition section, and the milling depth of the milling machine should be slowly adjusted from zero to the calculated milling depth; Secondly, during the milling process, the milling depth adjustment section, whether increasing or decreasing the milling depth, must be gradually adjusted from the original milling depth to the new milling depth, and sudden changes are strictly prohibited. This requires that the position of the adjustment transition section be calibrated when defining the milling interval; Thirdly, at the end of the milling transition section, the milling machine should also slowly reduce the original milling depth to zero.

銑刨作業(yè)時(shí)保證縱向邊線的順直,一段銑刨完成后銑刨機(jī)直接后退,重新開始向前面銑刨。

20210611113555881.jpg

During milling operations, ensure that the longitudinal edge line is straight. After completing a section of milling, the milling machine will directly move back and start milling again towards the front.

當(dāng)一個(gè)銑刨段中包括幾個(gè)連續(xù)銑刨區(qū)間時(shí),可以實(shí)施連續(xù)銑刨,在銑刨中調(diào)整銑刨深度,保證路面縱向平順。

When a milling section includes several continuous milling sections, continuous milling can be implemented, and the milling depth can be adjusted during milling to ensure the longitudinal smoothness of the pavement.

對(duì)銑刨拉毛面的缺陷必須進(jìn)行及時(shí)處理,如松散部位的與修復(fù),裂縫處及時(shí)灌縫等。在每處病害銑刨基坑的起訖位置,會(huì)由于銑刨鼓的圓形而形成弧面,在基坑整理時(shí)需要人工切割成豎直面,達(dá)到基坑四面方正。

The defects on the milling and roughening surface must be dealt with in a timely manner, such as removing and repairing loose parts, and filling cracks in a timely manner. At the starting and ending positions of each diseased milling and planing foundation pit, a curved surface will be formed due to the circular shape of the milling drum. During the foundation pit preparation, it needs to be manually cut into vertical planes to achieve a square shape on all sides of the foundation pit.

對(duì)銑刨深度已達(dá)到設(shè)計(jì)但病害仍未的病害,及時(shí)與現(xiàn)場(chǎng)監(jiān)理工程師和業(yè)主銜接,確定施工方案和工程數(shù)量,以便同步一次將病害銑刨,節(jié)省機(jī)械二次調(diào)轉(zhuǎn)時(shí)間和費(fèi)用。

For diseases that have reached the designed milling depth but have not yet been eliminated, timely communication with the on-site supervision engineer and the owner should be made to determine the construction plan and quantity of work, so as to synchronously milling and planing the diseases in one go, saving time and cost for mechanical secondary adjustment.

感謝您的閱讀,此文的文章來源:冷再生機(jī)租更多的內(nèi)容和問題請(qǐng)點(diǎn)擊:http://m.jsscr.com我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!

Thank you for reading. The source of this article is: Cold Recycling Machine Rental. For more information and questions, please click: http://m.jsscr.com We will continue to work hard to provide you with services. Thank you for your support!

閱讀/ Recommended reading

  更換液壓油和濾芯是確保液壓系統(tǒng)正常運(yùn)行和延長(zhǎng)使用壽命的重要步驟。以下是一個(gè)詳細(xì)的更換液壓油和濾芯的指南:  Replacing the hydraulic oil and f...

冷再生機(jī)和路拌機(jī)的工作效率比較強(qiáng) 2025-01-15
冷再生機(jī)和路拌機(jī)在工作效率上有什么區(qū)別嗎 2025-01-07
冷再生機(jī)和路拌機(jī)哪個(gè)更省錢 2025-01-04
冷再生機(jī)和銑刨機(jī)哪個(gè)效率更高 2024-12-28

產(chǎn)品/ Recommended products