冷再生機(jī)的控制要點要注意什么?
混合料佳含水量現(xiàn)場監(jiān)測辦法,一手抓起一把混合料,用力握實,然后松手讓其自由落向地面,正常會立即摔散花,里面沒有小團(tuán)料。反復(fù)試驗,介于落地松散和抱團(tuán)之間的臨界含水量即佳含水量,一般比試驗單上的佳含水量數(shù)值多1%-2%。
The on-site monitoring method for the optimal moisture content of the mixture is to grab a handful of the mixture with one hand, firmly grip it, and then release the hand to let it fall freely to the ground. Normally, it will immediately scatter flowers without small clumps inside. Repeated experiments have shown that the critical moisture content between loose ground and clumping is the optimal moisture content, which is generally 1% -2% higher than the optimal moisture content value on the test sheet.
作業(yè)施工冷再生機(jī)停車時一定要離開已施工或待施工水泥已攤鋪路面,以防止漏水引起的局部水大。
When parking the cold recycling machine for homework construction, it is necessary to leave the already constructed or cement paved road surface to prevent local water leakage.
施工車輛停放時一定要錯開第二天的段道預(yù)工作面,以防止耽誤第二天的人工水泥攤鋪,施工車輛好不要停放在已完成施工的路面上。防治破壞新建結(jié)構(gòu)和影響后期灑水養(yǎng)生。
When parking construction vehicles, it is necessary to stagger the first section of the first pre working surface of the next day to prevent delays in manual cement paving. Construction vehicles should not be parked on the completed road surface. Prevent and control the damage to newly constructed structures and the impact on later watering and health preservation.
避免犯“過壓”的錯誤,即過度壓實。若達(dá)到材料的大密實度后仍然繼續(xù)碾壓,則會破壞材料,反而降低其密實度。
Avoid making the mistake of excessive compaction. If the material continues to be compacted after reaching its high density, it will damage the material and instead reduce its density.
冷再生租賃機(jī)的施工作業(yè)應(yīng)該在每天下午15:00—16:00之間結(jié)束,以便后續(xù)施工能在天黑前結(jié)束。
The construction work of the cold regeneration rental machine should be completed between 3:00 pm and 4:00 pm every day, so that subsequent construction can be completed before dark.
每天冷再生機(jī)結(jié)束施工進(jìn)行洗刀停車后,應(yīng)通知操作手仔細(xì)檢查車況并更換刀頭,以免耽誤第二天的施工進(jìn)度。
After the construction of the cold regeneration machine is completed and the knife is washed and stopped every day, the operator should be notified to carefully inspect the condition of the vehicle and replace the knife head to avoid delaying the construction progress of the next day.
冷再生租賃機(jī)常見問題有哪些處理方法
What are the common problems and solutions for cold regeneration rental machines
如果混合料局部水大的話,為防止翻漿壓不住。需將水大的混合料挖出換成含水量適合的混合料(如是碾壓完成的施工段需多摻水泥)回填后,進(jìn)行人工找平后壓路機(jī)碾壓。
If there is a large amount of water in the local area of the mixture, in order to prevent it from being unable to be compressed due to boiling. The mixture with high water content needs to be excavated and replaced with a mixture with suitable water content (if the construction section is compacted, more cement needs to be added). After backfilling, manual leveling and roller compaction are carried out.
如有施工完路段,發(fā)現(xiàn)漏條或跳打現(xiàn)象,由人工在冷再生漏打的地域按比例鋪上水泥,再生機(jī)重新倒車作業(yè)重打,如是漏打的地方很小,則小應(yīng)鋪滿冷再生轉(zhuǎn)子一樣大的地方,由冷再生租賃機(jī)扣刀打一下即抬起,原則就是避免多打,破壞已完成的結(jié)構(gòu)。
If there is a section of the road that has been constructed and any missing or skipped bars are found, manual laying of cement will be carried out in proportion in the area where the cold regeneration is missed, and the regeneration machine will reverse and operate again. If the missed area is very small, the small area should be covered with the same size as the cold regeneration rotor. The cold regeneration rental machine should use a knife to strike and lift it up, and the principle is to avoid excessive hitting and damage to the completed structure.
如果雨季施工水泥已鋪到路上,趕上下雨,視雨水大小情況,適當(dāng)減少或停止冷再生機(jī)作業(yè)的供水,用振動壓路機(jī)迅速振動碾壓一遍后,如混合料沾輪情況嚴(yán)重,平地機(jī)迅速找平后停止光輪壓路機(jī)碾壓,用振動壓路機(jī)振動碾壓2遍后即可。
If the cement has been laid on the road during the rainy season and it rains, depending on the size of the rain, the water supply for the cold recycling machine operation should be appropriately reduced or stopped. After using a vibrating roller to quickly vibrate and compact it once, if the mixture is heavily stained with wheels, the leveling machine should quickly level it and stop the smooth wheel roller from rolling. After using a vibrating roller to vibrate and compact it twice, it is sufficient.
本文由冷再生機(jī)租賃提供幫助,更多的相關(guān)內(nèi)容請點擊http://m.jsscr.com希望本文能夠為您帶來幫助,感謝您的閱讀!
This article provides assistance from the leasing of cold regeneration machines. For more related content, please click on http://m.jsscr.com I hope this article can be helpful to you. Thank you for reading!
閱讀/ Recommended reading
- 水泥撒布車的知識特點介紹 2025-02-28
- 冷再生機(jī)是一種、多用途的道路施工 2025-02-25
- 冷再生機(jī):土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
- 冷再生機(jī)液壓油的作用 2025-02-17
冷再生機(jī)的操作規(guī)程是確保操作人員和設(shè)備的重要指導(dǎo)原則。以下是冷再生機(jī)操作規(guī)程的詳細(xì)內(nèi)容: The safety operating procedures for...