1、冷再生施工租賃場(chǎng)地準(zhǔn)備
1. Preparation of rental site for cold regeneration construction
(1)直接填筑的路基基底,施工前必需經(jīng)過檢查簽證;需求停止地基處置的基底必需完成各項(xiàng)處置,并滿足地基處置的請(qǐng)求。
(1) The roadbed base directly filled must undergo inspection and certification before construction; The foundation that requires cessation of foundation disposal must complete all disposal tasks and meet the requirements for foundation disposal.
(2)場(chǎng)地應(yīng)該保證足夠的平整度,滿足設(shè)備、人員進(jìn)場(chǎng)請(qǐng)求。
(2) The site should ensure sufficient flatness to meet the requirements for equipment and personnel entry.
(3)做好場(chǎng)地的暫時(shí)排水和防雨措施。依照施工運(yùn)量和施工機(jī)械的大荷載建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. According to the construction traffic volume and construction machinery, a large load construction road is constructed.


2、技術(shù)準(zhǔn)備
2. Technical preparation
冷再生機(jī)租賃廠家提醒您要做好相關(guān)人員的技術(shù)培訓(xùn)和技術(shù)交底工作,使參與施工的全體人員充沛認(rèn)識(shí)高速鐵路路基填筑的關(guān)鍵技術(shù)、質(zhì)量控制要點(diǎn)。
The manufacturer of the cold recycling machine reminds you to provide technical training and disclosure to relevant personnel, so that all personnel involved in the construction can fully understand the key technologies and quality control points of high-speed railway roadbed filling.
3、勞動(dòng)力、機(jī)械設(shè)備配置人員、機(jī)械設(shè)備應(yīng)依據(jù)施工計(jì)劃組合工期請(qǐng)求停止合理的配置。路堤填筑區(qū)為一個(gè)完好的作業(yè)區(qū),每個(gè)作業(yè)區(qū)人員配置:施工隊(duì)長(zhǎng)1名,領(lǐng)工員2名,指揮卸土位置人員2名,丈量及實(shí)驗(yàn)檢測(cè)人員4~6人,其他機(jī)械工、普工20~30人。
3. Labor force, mechanical equipment allocation personnel, and mechanical equipment should be requested to stop reasonable allocation based on the construction plan and construction period. The embankment filling area is a complete operation area, with one construction team leader, two foremen, two personnel commanding the unloading position, 4-6 measuring and experimental testing personnel, and 20-30 other mechanical and general workers in each operation area.
依據(jù)施工需求,每個(gè)作業(yè)面裝備反鏟發(fā)掘機(jī)一臺(tái)、宣化-140推土機(jī)一臺(tái)、YZ-22振動(dòng)壓路機(jī)兩臺(tái)、天工-160平地機(jī)一臺(tái),徐工-230灰土拌和機(jī),自卸運(yùn)輸車6輛,撒水車一臺(tái)備用。當(dāng)運(yùn)距較遠(yuǎn)時(shí),自卸車的數(shù)量可恰當(dāng)增加
According to the construction requirements, each working face is equipped with one backhoe excavator, one Xuanhua 140 bulldozer, two YZ-22 vibratory rollers, one Tiangong 160 Grader, XCMG 230 lime soil mixer, six dump trucks and one sprinkler for standby. When the transportation distance is far, the number of Dump truck can be appropriately increased
冷再生機(jī)使用前要做好哪方面的準(zhǔn)備相關(guān)內(nèi)容就講解到這里了,希望能夠給您好的幫助,更多事項(xiàng)就來我們網(wǎng)站http://m.jsscr.com咨詢吧!
That's all we need to do before using the cold recycling machine. We hope it can be helpful to you. For more information, please come to our website http://m.jsscr.com Consult!
閱讀/ Recommended reading
- 冷再生機(jī)租賃:改良土?xí)玫侥男┰O(shè)備? 2025-04-18
- 租賃冷再生機(jī)有什么優(yōu)勢(shì) 2025-04-15
- 冷再生機(jī)租賃燃油費(fèi)和操作手費(fèi)用誰承擔(dān)? 2025-04-14
- 冷再生機(jī)租賃:粉料撒布車工作原理及優(yōu)勢(shì) 2025-04-12
冷再生機(jī)有哪些類型
[2018-08-23]
在現(xiàn)代交通網(wǎng)絡(luò)持續(xù)發(fā)展的進(jìn)程中,道路養(yǎng)護(hù)成為保障交通順暢的關(guān)鍵環(huán)節(jié)。冷再生機(jī)作為道路養(yǎng)護(hù)領(lǐng)域的重要設(shè)備,憑借其獨(dú)特的技術(shù)和顯著優(yōu)勢(shì),為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設(shè)...