首頁>>新聞中心冷再生機(jī)的整形與碾壓操作事項(xiàng)

冷再生機(jī)的整形與碾壓操作事項(xiàng)

來源:http://m.jsscr.com/ 日期:2023-02-17 發(fā)布人:
冷再生機(jī)將再生混合料拌和均勻并由振動(dòng)壓路機(jī)穩(wěn)壓一遍后,應(yīng)立即用平地機(jī)初步整形。在直線和不設(shè)平曲線段,平地機(jī)由路肩向路中間刮平;在設(shè)的平曲線段,平地機(jī)由內(nèi)側(cè)向外側(cè)進(jìn)行刮平。
After the cold regenerator mixes the recycled mixture evenly and stabilizes it once by the vibratory roller, the grader shall be used immediately for preliminary shaping. In straight and non-flat curve sections, the grader shall level from the shoulder to the middle of the road; In the set flat curve section, the grader shall level from the inside to the outside.
必要時(shí)再返回刮一遍,對(duì)于局部低洼處,應(yīng)用鐵鎬將表層5cm以上耙松,并用新拌的混合料進(jìn)行找平。整形的過程中應(yīng)及時(shí)粗細(xì)料離析現(xiàn)象。既由人工配合機(jī)械把大塊沒有破碎掉的舊路料掉。整形時(shí)應(yīng)將高處料直接刮出路外,不應(yīng)形成薄層貼補(bǔ)現(xiàn)象。
If necessary, go back and scrape again. For local low-lying areas, use an iron pick to loosen the surface layer more than 5cm, and use the freshly mixed mixture for leveling. The segregation of coarse and fine materials shall be eliminated in time during the shaping process. The large pieces of old road materials that have not been broken shall be removed manually and mechanically. During shaping, the high materials should be directly scraped out of the way, and there should be no thin layer of patching.
冷再生機(jī)租賃廠家提醒您,在初平完成后,由振動(dòng)壓路機(jī)高幅/低頻穩(wěn)壓一遍,然后由測(cè)量工按照質(zhì)量控制要求分左、中、右三點(diǎn)放樣控制標(biāo)高和橫坡度(直線段20米1點(diǎn),彎道10米一點(diǎn)),進(jìn)行細(xì)致找平,達(dá)到調(diào)拱度、調(diào)坡度的目的。保證平整度、橫坡度符合設(shè)計(jì)要求。
The cold recycling machine rental manufacturer reminds you that after the initial leveling is completed, the vibratory roller will stabilize the high amplitude/low frequency voltage once, and then the surveyor will set out and control the elevation and cross slope at three points, namely, the left, the middle and the right according to the quality control requirements (20 meters and 1 point for the straight section and 10 meters and 1 point for the curve), and carry out fine leveling to achieve the purpose of camber and slope adjustment. Ensure that the flatness and cross slope meet the design requirements.
冷再生機(jī)租賃
冷再生機(jī)施工過程中要堅(jiān)持“寧刮不補(bǔ)”的原則,如果要補(bǔ)料的話,當(dāng)確定要補(bǔ)5cm以上的混合料,補(bǔ)料的時(shí)候,需在新補(bǔ)料中多摻水泥并保證含水量,以確保粘結(jié)性,碾壓的時(shí)候能不松散不起皮。
During the construction of the cold recycling machine, the principle of "scraping rather than patching" should be adhered to. If it is necessary to make up, when it is determined to make up more than 5cm of mixture, it is necessary to add more cement and ensure the water content in the new material to ensure the cohesiveness, and it is not loose and peeling when rolling.
做終平工作時(shí),一定要特別小心,確保整個(gè)表面刮平,使其縱向順適,路拱和符合設(shè)計(jì)要求。不要在低洼處落下刀片,須將局部高出部分刮除并掃出路外,因?yàn)檫@些料與下層料之間是沒有粘結(jié)力的,碾壓的時(shí)候容易造成起皮壓不住的現(xiàn)象。終平應(yīng)仔細(xì)進(jìn)行,對(duì)于局部低洼之處,不再進(jìn)行找補(bǔ),可留待鋪筑瀝青面層時(shí)處理。
During the final leveling work, special care must be taken to ensure that the entire surface is scraped to make it longitudinal and comfortable, and the road camber meets the design requirements. Do not drop the blade at the low-lying place, but scrape and sweep out the locally higher part, because there is no adhesive force between these materials and the lower layer, which is easy to cause peeling and crushing when rolling. The final leveling shall be carried out carefully. For local low-lying areas, no need to make up, but can be left for treatment when paving the asphalt surface course.
找平完畢后進(jìn)行1-2遍碾壓,碾壓前如混合料表面風(fēng)干,可用灑水車噴灑補(bǔ)水,以防壓不住。初壓時(shí)使用高幅/低頻振動(dòng)模式,以便壓實(shí)層面的下部,隨后使用低幅/高頻振動(dòng)模式壓實(shí)再生層的上部。碾壓時(shí)應(yīng)先輕后重,自路邊向路中依次碾壓,碾壓速度應(yīng)控制在低速度,注意錯(cuò)輪寬度并且不漏壓。
After leveling, carry out 1-2 times of rolling compaction. If the surface of the mixture is dried before rolling compaction, spray water with a watering cart to prevent it from being crushed. The high amplitude/low frequency vibration mode is used for initial compaction to compact the lower part of the layer, and then the low amplitude/high frequency vibration mode is used to compact the upper part of the regeneration layer. The rolling shall be carried out from light to heavy, from the roadside to the middle of the road in turn, and the rolling speed shall be controlled at a low speed. Pay attention to the width of the staggered wheels and do not miss the rolling.
因?yàn)樗嗟年P(guān)系,在施工期間,從加水拌合碾壓成型灑水養(yǎng)護(hù),不得超過4小時(shí)。以上就是為大家介紹的有關(guān)冷再生機(jī)的詳細(xì)的介紹,希望對(duì)您有所幫助。如果您有什么疑問的話,歡迎聯(lián)系我們http://m.jsscr.com
Due to the relationship between cement, during the construction period, from mixing with water to rolling and forming, watering and curing shall not exceed 4 hours. The above is a detailed introduction of the cold regenerator for you, and I hope it will help you. If you have any questions, please contact us http://m.jsscr.com 。

閱讀/ Recommended reading

在現(xiàn)代交通網(wǎng)絡(luò)持續(xù)發(fā)展的進(jìn)程中,道路養(yǎng)護(hù)成為保障交通順暢的關(guān)鍵環(huán)節(jié)。冷再生機(jī)作為道路養(yǎng)護(hù)領(lǐng)域的重要設(shè)備,憑借其獨(dú)特的技術(shù)和顯著優(yōu)勢(shì),為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設(shè)...

冷再生機(jī)租賃:改良土?xí)玫侥男┰O(shè)備? 2025-04-18
租賃冷再生機(jī)有什么優(yōu)勢(shì) 2025-04-15
冷再生機(jī)租賃燃油費(fèi)和操作手費(fèi)用誰承擔(dān)? 2025-04-14
冷再生機(jī)租賃:粉料撒布車工作原理及優(yōu)勢(shì) 2025-04-12

產(chǎn)品/ Recommended products