新聞中心
新聞資訊
聯(lián)系我們

山東途暢路橋工程有限公司
聯(lián)系人:石總
電話:18264104888
地址:山東省濟南市槐蔭區(qū)經(jīng)一路273號群盛華城
冷再生施工各方面的準備工作
來源:http://m.jsscr.com/ 日期:2022-08-24 發(fā)布人:
不管什么施工都建議是在之前做好相應(yīng)的準備工作,一方面是為了更好的去提高工作質(zhì)量加快工作進度,二來是為了保障人員的。下面冷再生機租賃廠家講講冷再生施工各方面的準備工作。
No matter what construction, it is recommended to make corresponding preparations before construction. On the one hand, it is to better improve the work quality and speed up the work progress, and on the other hand, it is to ensure the safety of personnel. Next, the rental manufacturer of the cold regeneration machine will talk about the preparation work in all aspects of the cold regeneration construction.
場地準備
Site preparation
(1)直接填筑的路基基底,施工前必需經(jīng)過檢查簽證;需求停止地基處置的基底必需完成各項處置,并滿足地基處置的請求。
(1) The subgrade base directly filled must be inspected and signed before construction; The foundation that needs to stop foundation treatment must complete various treatments and meet the requirements of foundation treatment.
(2)場地應(yīng)該保證足夠的平整度,滿足設(shè)備、人員進場請求。
(2) The site shall ensure sufficient flatness to meet the mobilization requirements of equipment and personnel.
(3)做好場地的暫時排水和防雨措施。依照施工運量和施工機械的大荷載建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. The construction access road shall be built according to the large load of construction traffic and construction machinery.
技術(shù)準備
Technical preparation
做好相關(guān)人員的技術(shù)培訓(xùn)和技術(shù)交底工作,使參與施工的全體人員充沛認識高速鐵路路基填筑的關(guān)鍵技術(shù)、質(zhì)量控制要點。
The technical training and technical disclosure of relevant personnel shall be carried out to make all personnel involved in the construction fully understand the key technologies and quality control points of high-speed railway subgrade filling.


平安控制要點
Safety control points
1、施工區(qū)域應(yīng)設(shè)警示標志,嚴禁非工作人員出入。
1. Warning signs shall be set in the construction area, and non staff are strictly prohibited from entering and leaving.
2、施工中應(yīng)對機械設(shè)備停止定期檢查、養(yǎng)護、維修。
2. Regular inspection, maintenance and repair of mechanical equipment shall be stopped during construction.
3、為保證施工平安,現(xiàn)場應(yīng)有專人統(tǒng)一指揮,并設(shè)一名專職平安員擔(dān)任現(xiàn)場的平安工作,堅持班行進行平安教育制度。
3. In order to ensure the safety of construction, the site shall be under the unified command of a special person, and a full-time safety officer shall be appointed to take charge of the safety work on the site, and the safety education system shall be adhered to.
4、改進土施工中,現(xiàn)場設(shè)專人指揮、調(diào)度,肯定適宜的機械車輛走行道路,并設(shè)立明顯標志,避免互相干擾碰撞,機械作業(yè)要留有平安間隔。制定作業(yè)程序和運轉(zhuǎn)道路,確保諧和施工,平安消費。
4. During the construction of improved soil, special personnel shall be assigned to direct and dispatch the construction site to confirm the appropriate road for mechanical vehicles and set up obvious signs to avoid mutual interference and collision. Safe intervals shall be reserved for mechanical operations. Formulate operation procedures and operation roads to ensure harmonious construction and safe consumption.
冷再生施工各方面的準備工作的相關(guān)內(nèi)容就講解到這里了,您對此有什么疑問可關(guān)注我們網(wǎng)站http://m.jsscr.com直接來咨詢。
That's all about the preparations for cold recycling construction. If you have any questions, please follow our website http://m.jsscr.com Come directly to consult.
閱讀/ Recommended reading
- 冷再生機租賃:改良土?xí)玫侥男┰O(shè)備? 2025-04-18
- 租賃冷再生機有什么優(yōu)勢 2025-04-15
- 冷再生機租賃燃油費和操作手費用誰承擔(dān)? 2025-04-14
- 冷再生機租賃:粉料撒布車工作原理及優(yōu)勢 2025-04-12
冷再生機有哪些類型
[2018-08-23]
在現(xiàn)代交通網(wǎng)絡(luò)持續(xù)發(fā)展的進程中,道路養(yǎng)護成為保障交通順暢的關(guān)鍵環(huán)節(jié)。冷再生機作為道路養(yǎng)護領(lǐng)域的重要設(shè)備,憑借其獨特的技術(shù)和顯著優(yōu)勢,為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設(shè)...