路面冷再生機的組成和工作原理

來源:http://m.jsscr.com/ 日期:2021-08-04 發(fā)布人:
一般來說,長期經(jīng)受重型交通的路面會出現(xiàn)路基損壞的情況。為了這種損壞,需要對整個路面進行結(jié)構(gòu)性維修。路面冷再生機將銑刨料全部進行重新利用,加之其經(jīng)濟的處理方式,使得采用泡沫瀝青進行冷再生施工成為一種開創(chuàng)性解決方案,達到而經(jīng)濟的作用。
Generally speaking, the pavement subject to heavy traffic for a long time will have subgrade damage. In order to eliminate this damage, the whole pavement needs to be structurally repaired. The road cold recycling machine reuses all the milling materials, and its economic treatment mode makes the cold recycling construction of foamed asphalt become a pioneering solution to achieve the environmental protection and economic role.
組成:路面冷再生機是瀝青路面冷再生施工中的主要設(shè)備,一般由動力系統(tǒng)、傳動系統(tǒng)、工作裝置、噴灑系統(tǒng)和操縱控制系統(tǒng)組成。
Composition: pavement cold recycling machine is the main equipment in asphalt pavement cold recycling construction. It is generally composed of power system, transmission system, working device, spraying system and operation control system.
工作原理:路面冷再生機向前行進時,轉(zhuǎn)子向上旋轉(zhuǎn)銑刨原路面材料,同時,水通過軟管從路面冷再生機連接的水車中輸送過來,并在路面冷再生機的拌和倉中噴灑。水的輸送量通過微處理器控制的泵送系統(tǒng)準確控制,以達到需要的含水量。
Working principle: when the pavement cold regenerator moves forward, the rotor rotates upward to mill the raw pavement materials. At the same time, the water is transported from the water truck connected to the pavement cold regenerator through the hose and sprayed in the mixing bin of the pavement cold regenerator. The delivery volume of water is accurately controlled by the microprocessor-controlled pumping system to achieve the required water content.
銑刨轉(zhuǎn)子將水與銑刨料充分拌和。液體穩(wěn)定劑,例如熱瀝青(冷再生機自帶泡沫瀝青發(fā)泡裝置,可將熱瀝青加熱到160-180°C,與少量水混合發(fā)泡)可通過專門設(shè)計的噴灑嘴被噴灑到拌和腔;粉狀穩(wěn)定劑如水泥需按設(shè)計添加量事先灑布在路面冷再生機前的路面上,路面冷再生機將粉狀穩(wěn)定劑與再生料和水一次性拌和。如遇再生層原級配不好的情況,可在再生前將所缺少的部分集料灑布在路面上,通過與舊料拌和來改善原路面材料的級配。
The milling rotor shall fully mix the water with the milling material. Liquid stabilizer, such as hot asphalt (cold recycling machine with foam asphalt foaming device, can heat asphalt to 160-180 degrees C, mixing with a small amount of water) can be sprayed to the mixing chamber through a specially designed spray nozzle. Powdery stabilizer such as cement shall be sprinkled on the pavement in front of the pavement cold regenerator according to the designed addition amount, and the pavement cold regenerator shall mix the powdery stabilizer with recycled material and water at one time. If the original gradation of the recycled layer is not good, the missing part of the aggregate can be sprinkled on the pavement before regeneration, and the gradation of the original pavement materials can be improved by mixing with the old materials.

閱讀/ Recommended reading

一、路基養(yǎng)護應(yīng)通過對公路各部分的日常巡視和定期檢查,發(fā)現(xiàn)病害及時查明原因,采取有效措施進行修復(fù)或加固,病害根源。其作業(yè)范圍應(yīng)包括下列內(nèi)容:1、 Roadbed mainten...

改良土施工要用到什么設(shè)備 2025-04-26
帶你了解水泥路面碎石化技術(shù) 2025-04-24
冷再生機有哪些類型 2025-04-19
冷再生機租賃:改良土?xí)玫侥男┰O(shè)備? 2025-04-18

產(chǎn)品/ Recommended products